April 23, 2024
Route 94–Agate Point
Ferncliff Avenue Road Closure
Effective Monday–Friday, April 29–May 3
Starting on Monday, April 29, a portion of Ferncliff Avenue between Casey Street and Byron Drive will be closed during utility work. The work is expected to last through Friday, May 3, weather permitting.
During the road work, Route 94–Agate Point will not serve the closed section of Ferncliff Avenue and will travel Grand Avenue and Byron Drive to its normal route (see map).
Outside the downtown core, riders can flag down Routed buses along the detour route at any safe roadside location.
If you have questions, contact Customer Service at 360.373.2877 or 800.501.RIDE.